AEC VTG Coolant Plumbing Diagram
NOTE! This sketch was made as a guide for the assembly of prototype and first production V8-engined Goods chassis. All fixed piping was in copper, flexible connections were in rubber hose.
'U' (Experimental) part numbers shown were for pre-production drawings and it must be appreciated that subsequent layouts may have differed as a result of further research and development.
|
|